|
|
|
|
|
|
|
|
|
5
|
|
Sector
|
Non Classified Tenders
|
Tender Value
|
N.A.
|
|
Location
|
Morocco Tenders
|
Ref.No
|
101378891
|
|
Closing Date
|
29 - Oct - 2026
|
20 Days to go
|
View Tender Details
|
|
Reconstruction of the Taamrit Mosque in the province of Zagora, including various construction works such as earthworks, masonry, waterproofing, flooring, plumbing, electrical installations, and painting. Demolition of existing structures, excavation, backfilling, concrete, masonry, PVC pipes, septic tanks, reinforced concrete, thermal insulation, flooring materials, wooden and metal carpentry, electrical components, plumbing fixtures, paints
|
|
|
|
|
|
7
|
|
Sector
|
Non Classified Tenders
|
Tender Value
|
N.A.
|
|
Location
|
Morocco Tenders
|
Ref.No
|
101439561
|
|
Closing Date
|
29 - Oct - 2026
|
20 Days to go
|
View Tender Details
|
|
The work involves the extension of primary educational institutions located in the municipalities of Taouloukoult, Saaidate, Oulad Moumna, and Chichaoua, under the provincial direction of Chichaoua, AREF-MS, by constructing eight (08) preschool classrooms. Additionally, it includes the extension of primary educational institutions in the municipalities of Chichaoua, Ahdil, Lamazoudia, Sid L'Mokhtar, and Zaouia Ennahlia, also by constructing eight (08) preschool classrooms. Furthermore, it covers the extension of primary educational institutions in the municipalities of Mejjat, Imin Dounit, Edouirane, Lamzoudia, and Chichaoua, by constructing seven (07) preschool classrooms. preschool classrooms
|
|
|
|
8
|
|
Sector
|
Non Classified Tenders
|
Tender Value
|
N.A.
|
|
Location
|
Morocco Tenders
|
Ref.No
|
101439593
|
|
Closing Date
|
29 - Oct - 2026
|
20 Days to go
|
View Tender Details
|
|
The contractor is required to organize the site to eliminate and/or reduce potential risks of accidents and incidents inherent to the work by adopting adequate preventive measures. The contractor must conduct a preliminary site visit to understand potential risks associated with the intervention area and surrounding zones. They must ensure the safety and health of workers and hygiene on the site, taking into account the dangers posed by the products and materials used. A safety officer must be appointed to implement preventive measures and ensure compliance with safety provisions in the hygiene, safety, and environmental plan (PHSE). The contractor must provide a detailed PHSE plan, which includes identifying hazards, analyzing foreseeable risks, and outlining measures for hygiene and safety. The contractor is also responsible for the maintenance of safety protections and must ensure that only qualified workers access high-risk areas. Additionally, a site circulation plan must be established and regularly updated, detailing access points, signage, and vehicle management. The contractor must ensure that all machinery used is appropriate and regularly inspected, and that all personnel are properly trained and certified. Equipment and consumables for the drinking water analysis laboratory in Marrakech, tree trimming near medium voltage lines, rehabilitation works for pumping stations, studies for the rehabilitation and expansion of wastewater networks, supply and installation of a backup transformer, acquisition of water suction and drainage equipment, maintenance of wastewater treatment plants, and various studies related to water supply and distribution.
|
|
|
|
|
|
10
|
|
Sector
|
Non Classified Tenders
|
Tender Value
|
N.A.
|
|
Location
|
Morocco Tenders
|
Ref.No
|
101439680
|
|
Closing Date
|
29 - Oct - 2026
|
20 Days to go
|
View Tender Details
|
|
The contractor must organize the site to eliminate and/or reduce potential risks of accidents and incidents inherent to the work by adopting adequate preventive measures. The contractor is required to conduct a preliminary site visit to understand potential risks associated with the intervention area and surrounding zones. They must ensure the safety and health of workers and hygiene on the site, taking into account the dangers posed by the products and materials used. A safety officer must be appointed to implement preventive measures and ensure compliance with safety provisions in the hygiene, safety, and environmental plan (PHSE). The contractor must provide a detailed PHSE plan, which includes identifying hazards, analyzing foreseeable risks, and outlining measures for hygiene and safety. The contractor is also responsible for the maintenance of safety protections and must ensure that only qualified workers access high-risk areas. A traffic plan for the site must be established and regularly updated, ensuring safe access and circulation for workers and vehicles. Equipment and consumables for the drinking water analysis laboratory in Marrakech, tree trimming near medium voltage lines, rehabilitation works for pumping stations, studies for the rehabilitation and expansion of wastewater networks, supply and installation of a backup transformer, acquisition of water suction and drainage equipment, maintenance of wastewater treatment plants, and various studies related to water supply and distribution.
|
|
|